My oversized equipment needs special permits
Permit applications, routing, and specialized carriers for Ohio, OH.
You have machinery that's too wide, tall, or heavy for standard shipping. Last time you tried moving oversized equipment, it got stuck at a weigh station because the permits weren't right. Ohio has specific rules for oversized loads, and missing even one permit can shut down your shipment for days.
Oversized equipment needs state permits before it can legally travel on public roads. Each state has different size and weight limits, restricted routes, and permit requirements. Ohio requires permits for loads over 8.5 feet wide, 13.5 feet tall, or exceeding weight limits on specific axle configurations.
Permit costs vary by size and route, typically ranging from $15 to $100 per state. Multi-state moves need permits from every state the load crosses. Processing time is usually 3-5 business days, but complex routes or peak seasons can take longer. Escort vehicles add $150-300 per day depending on the load dimensions.
Start by measuring your equipment's exact dimensions and weight. Map your route to identify which states you'll cross and check for bridge restrictions or road closures. Gateway Logistics handles permit applications, finds qualified carriers with the right trailers, and plans routes around restricted bridges and low clearances.
Once permits are secured and routing is confirmed, your oversized equipment moves smoothly from pickup to delivery. No surprise delays at weigh stations, no scrambling for last-minute permits, no equipment sitting on the roadside waiting for clearance.
Other things people in Ohio ask
over dimensional freight permits routing
Over dimensional freight requires state permits, pilot cars, and approved routes. Start the permit process 3-5 days early. Work with a broker who handles the paperwork and knows which routes avoid low bridges and weight restrictions.
heavy equipment freight shipping oversized
Heavy haul freight requires specialized trailers, route planning, and often permits for oversized loads. Work with carriers experienced in industrial freight who handle permitting and escort requirements.
how long do over dimensional permits take
Most state permits take 2-5 business days. Some states offer expedited processing for extra fees. Start the permit process as soon as you know the shipment dimensions and route. Plan for delays during peak construction season.
how long does over dimensional shipping take
Over dimensional permits can take 3-10 business days depending on the states involved. The actual shipping takes longer too - oversized loads often can't travel at night, on weekends, or during rush hour. Plan for 2-3 times longer than regular freight, especially if crossing multiple states.