My oversized equipment needs special permits
Permit applications, routing, and carrier matching for over dimensional loads in Georgia, GA.
You have machinery or equipment that won't fit on a standard truck. The last shipment got stuck at a weigh station because you didn't have the right permits. Georgia requires specific documentation for loads that exceed legal size limits, and each state your shipment crosses has different rules.
Over dimensional loads are shipments that exceed standard legal limits for height, width, length, or weight. In Georgia, anything over 8.5 feet wide, 13.5 feet high, or 53 feet long needs special permits. Bridge clearances on I-75 through Atlanta and weight restrictions on older rural roads make routing critical.
Permit costs range from $15 to $150 per state, depending on your load dimensions. Multi-state moves can take 3-5 business days for permit approval. Specialized trailers like lowboys or RGNs add $500-2000 to your shipping cost. Emergency permits cost more but process faster.
Get your equipment dimensions and weight before calling anyone. Gateway Logistics handles permit applications for all states on your route, finds carriers with the right equipment, and plans routes around restricted bridges. Don't attempt this yourself - one missed permit shuts down your shipment for days and triggers fines.
Your equipment moves legally and on schedule. No surprise delays at weigh stations. No scrambling for last-minute permits or route changes.
Other things people in Georgia ask
over dimensional freight permits routing
Over dimensional freight requires state permits, pilot cars, and approved routes. Start the permit process 3-5 days early. Work with a broker who handles the paperwork and knows which routes avoid low bridges and weight restrictions.
heavy equipment freight shipping oversized
Heavy haul freight requires specialized trailers, route planning, and often permits for oversized loads. Work with carriers experienced in industrial freight who handle permitting and escort requirements.
how long do over dimensional permits take
Most state permits take 2-5 business days. Some states offer expedited processing for extra fees. Start the permit process as soon as you know the shipment dimensions and route. Plan for delays during peak construction season.
how long does over dimensional shipping take
Over dimensional permits can take 3-10 business days depending on the states involved. The actual shipping takes longer too - oversized loads often can't travel at night, on weekends, or during rush hour. Plan for 2-3 times longer than regular freight, especially if crossing multiple states.
Ready to talk?
Gateway Logistics handles over dimensional in Georgia and the area around it.